头头体育唯一官网 头头体育唯一官网

头头体育唯一官网



      We are transmission system operator of the Czech Republic. We ensure safe and reliable operation and development of the Czech power system within interconnected European systems.

      see how

      Announced regulation stage:

      Basic
      Základní stupeň
      stage

      more information
      400kV line Total length 3 735 KM

      220kV line Total length 1 909 KM

      Substations connected 42

      Power plants connected 13

      
          鸿泰体育万豪注册中博官网龙8平台游戏中心下载乐赢客户端大唐投注盈丰现金网
          baiduxml